HKM / WATERPROOFING SOLUTIONS

Roof waterproofing in Hong Kong

Roof waterproofing addresses the substrate, waterproof layer, parapet junctions and drainage together. HKM assesses the existing roof before proposing local repairs, an overlay or removal and reconstruction.

Request an assessment
HKM roof work reference photograph
HKM roof work reference photograph

SERVICE SCOPE

What the service covers

  • 01Inspect existing roof layers and loose substrate
  • 02Detail cracks, parapets and pipe penetrations
  • 03Assess outlets, falls and ponding
  • 04Apply a suitable coating or membrane and agree testing

When should you enquire?

For village houses, apartment blocks and commercial roofs with rain-related leaks, aged layers or ponding. Roof ingress must be distinguished from tank or pipe leaks.

How we approach the work

Record leak locations and their relationship to rain, then assess adhesion and substrate strength. Sound layers may suit an overlay; widespread failure calls for a discussion of removal. Junctions, corners and outlets need attention before treating the main area.

What affects the quotation?

Roof area, access, removal, drainage corrections, equipment movement and the selected system affect pricing. Specify upstands, terminations and completion checks in the quotation.

Send the location, approximate area, timing of the leak and clear photos to discuss assessment. Final scope, materials, access, programme, testing and any warranty terms are confirmed in writing.

SPECIFIC QUESTIONS, CLEAR ANSWERS

Roof waterproofing FAQs

01Does roof waterproofing require stripping?+

Not always. An overlay may be assessed where the existing layer is bonded, the substrate is sound and drainage is suitable. Loose areas, widespread failure or serious ponding can require removal and reconstruction.

02Is one coat of paint enough?+

The main surface is only part of the system. Cracks, parapet junctions, outlets and penetrations also need treatment, with preparation, application and curing appropriate to the selected material.

03How is roof waterproofing checked?+

Agree suitable visual, spray or flood testing beforehand. Duration, depth and loading constraints depend on the site. Do not block outlets and flood a roof without an agreed assessment.

LET’S KEEP YOUR SPACE DRY.

Your next step to a drier space.

Tell us what is happening at your property. We’ll help you work out the next step.

9661 5504 WhatsApp / Telephone
Kwai Chung office
Rooms D & E, 4/F, Block 4, Golden Dragon Industrial Centre, 182–190 Tai Lin Pai Road, Kwai Chung, Hong Kong
Office visits by appointmentView map
PROJECT ENQUIRYA little detail goes a long way.
What can we help with? (select all that apply)

Your details will be combined into a draft. Review it before sending in WhatsApp or your email app. Photos can be added in WhatsApp.